SUMMARY
EXPLORATION
The September Quarter saw Copper Search expand its drilling program at the Peake Project in the Gawler Craton, South Australia. The Peake Project is prospective for Iron-Oxide-Copper-Gold (IOCG). The ongoing drilling program has been designed to test multiple largescale targets identified during an extensive project-wide review and by geophysical surveys undertaken over the last 12 months.
During the September quarter, the Copper Search team, drill tested three high-priority targets and conducted new geological surveys to refine targeting on potential follow-up drilling programs. All the new data collected has led the exploration team to focus its efforts on the Karari Shear Zone (KSZ). This geological structure runs NE-SW through the project and has proven to be fertile with IOCG-style drill intersections 18km apart at the neighbours (AIC Mines/BHP) Wills Prospect and CUS Target AC23.
Preparations for a six-hole RC drill program to follow up previous success from a single hole at Target AC23 were also made, with that drilling underway at the time of writing.
The cash position at 30 September 2023 was $3.7 million.
MORE INVESTOR UPDATES

Byrock Project Drilling Results
Assays have been received for the completed RC drilling.

Exploration Update: August 2026
An update on the exploration work and plans for Altitude’s projects

Altitude Expands W-Project Land Position
The new claims secure potentially prospective along-strike ground, interpreted to extend the structures hosting the W-Project quartz-calcite epithermal vein system
Quarterly Activities Report: June 2026
Catch up on all the latest Activities with this Quarterly Report

Exploration Update: July 2026
An update on the exploration work and plans for Altitude’s projects

Drilling Commenced At Byrock Copper Gold Project, Macquarie Arc – NSW
Drill permit issued and drilling rig contracted for 2,300m RC program to test three highest priority Pipe Targets