Drilling Permits Issued & Rig Contracted for Byrock Project

Share This Update

READ THE FULL ASX RELEASE

Highlights

• Drill permit issued: 2,300m RC program to test three (3) highest priority Pipe Targets

• Drilling rig contracted: UDR1000 multi-purpose rig – Resolution Drilling (NSW)

• The Byrock Project is a Company-interpreted north-west segment of the Macquarie Arc, which hosts the economic Cu-Au porphyry Cadia and North Parkes mines to the south. These deposits exhibit “pipe-like” geophysical features with dimensions analogous to Targets within the Byrock Project

• Earthworks to commence shortly

• Drilling to commence mid-June as planned

This planned drill program represents a decisive step in testing for concealed porphyry systems beneath shallow cover along the margin of the proven Macquarie Arc, home to world-class Cu-Au porphyry mines. This is exactly the type of generative exploration needed to drive the next generation of copper discoveries critical to meeting the growing demand for gold and copper.

Section A – A’ planned RC drill holes (26PL03 – 05) through the P38 Target, Byrock Project – drill tested with shallow aircore holes (ASX 6/2/2026) in November 2025 – prospective for a porphyry system. 3D inverted magnetic susceptibility shell 3000 x 10-5 SI (red) (ASX 7/5/2025) and 0.05 g/cc inverted density [gravity] shell (blue)

Location map showing Altitudes Pipe Targets, T55 Target and tenements relative to Inflection Resources

This presentation was delivered by Altitude’s Managing Director, Duncan Chessell, live at the RIU Resources Round up Conference at 9am (AEST) on the 06 May 2026 and covers the recent results of drilling programs at the Byrock Copper-Gold Project in more detail.

READ THE FULL ASX RELEASE

Latest Investor Updates

STAY UP TO DATE.

SUBSCRIBE TO THE COPPER SEARCH NEWSLETTER