SUMMARY
Copper Search Ltd (ASX: CUS) announces the completion of the second hole of the Winter 2024 Program and the commencement of an additional (third) hole at the Douglas Creek IOCG
Prospect.
The vertical diamond core drill hole 24PK14 was completed to 786m depth at the Douglas Creek IOCG Prospect at the Company’s Peake Project in South Australia’s Gawler Craton. The hole was extended from the planned 600m depth on inspection of the drill core. The drill core has been sent by truck to Adelaide and is due to arrive this week. Core cutting from the basement at 136m to the bottom of hole 786m will commence later this week at ALS Laboratories, and all samples will be submitted for assay. Assays will be released to the market in September.
At the Douglas Creek IOCG Prospect, an unplanned third hole, drill hole 24PK14-B, has commenced from the same drill pad as drill hole 24PK14. The hole will be drilled to the northeast to test the prospective coincident gravity and magnetic anomaly modelled at 300m to 800m depth.
MORE INVESTOR UPDATES
Quarterly Activities Report: June 2026
Catch up on all the latest Activities with this Quarterly Report

Exploration Update: July 2026
An update on the exploration work and plans for Altitude’s projects

Drilling Commenced At Byrock Copper Gold Project, Macquarie Arc – NSW
Drill permit issued and drilling rig contracted for 2,300m RC program to test three highest priority Pipe Targets

Altitude Minerals Podcast
EP02: Copper Gold Porphyry
In the latest episode of the Altitude Minerals Podcast, Managing Director Duncan Chessell is in conversation with world-leading geochemist and in-house porphyry expert Professor Bruce Schaefer to explore these elusive and valuable mineral systems, which account for roughly three-quarters of the world’s copper and a fifth of its gold.

Exploration Update: June 2026
An update on the exploration work and plans for Altitude’s projects

Drilling Permits Issued & Rig Contracted for Byrock Project
Drill permit issued and drilling rig contracted for 2,300m RC program to test three highest priority Pipe Targets