SUMMARY
EXPLORATION
The September Quarter saw Copper Search expand its drilling program at the Peake Project in the Gawler Craton, South Australia. The Peake Project is prospective for Iron-Oxide-Copper-Gold (IOCG). The ongoing drilling program has been designed to test multiple largescale targets identified during an extensive project-wide review and by geophysical surveys undertaken over the last 12 months.
During the September quarter, the Copper Search team, drill tested three high-priority targets and conducted new geological surveys to refine targeting on potential follow-up drilling programs. All the new data collected has led the exploration team to focus its efforts on the Karari Shear Zone (KSZ). This geological structure runs NE-SW through the project and has proven to be fertile with IOCG-style drill intersections 18km apart at the neighbours (AIC Mines/BHP) Wills Prospect and CUS Target AC23.
Preparations for a six-hole RC drill program to follow up previous success from a single hole at Target AC23 were also made, with that drilling underway at the time of writing.
The cash position at 30 September 2023 was $3.7 million.
MORE INVESTOR UPDATES

Compelling Drill Targets Defined at Byrock Project, NSW
Compelling RC drill targets have been confirmed at the Byrock Project to test for
Macquarie Arc pencil (pipe-like) porphyry deposits

Investor Presentation: RIU Resources Roundup Conference (May 2026)
Altitude Minerals – Investor Presentation

Altitude Secures Another Significant Gold & Silver Project in Nevada
Exclusive Option to Purchase the Gold & Silver W-Project near Winnemucca, complementary to Altitude’s 100% owned Firenze Silver & Gold Project, Nevada
Quarterly Activities Report: March 2026
Catch up on all the latest Activities with this Quarterly Report

Firenze Drill Targets Confirmed and Drill Permits Secured
Altitude Minerals Ltd is pleased to announce the appointment of Mr Gabe Graf as Principal Geologist – USA, effective immediately.

Geophysical Surveys Completed at the Byrock Project, Macquarie Arc, NSW
75 infill gravity stations and 92-line km of passive seismic have been acquired in total over the Pipes Targets and T55 Target in the last month as a validation step